Construction Machine Crane Operator Cabin overhead crane joystick controller

Nice-looking appearance cabin Comfortable Environment Intensity enough structure cab Toughened glasses Non-skid flour cabin

Products Details

overview

Operation Cabin are developed by us on the basis of the human engineering principle. They have well safety and protection devices, comfortable operating environment, and an uncrowded view. Using the advanced welding and manufacture technics, the appearances of the cabins are flat and clean. All the doors and windows are well sealed and shockproof. The crane operator cabin is made of the cold rolled steel plates by welding, and the steel plates are processing by the numerically controlled machine tool. The appearance is smooth and the structure is intensity enough. The windows glasses are 5mm toughened glasses. The transparency is higher than 80%. There is a bottom window in the cabin. The floor’s walking surface is covered with insulating rubber matting with non-skid walking surface. The floor is 3mm removable type steel plates. And the connector of the control wire has been preventing fraying treated.

parameter

Mechanism Operation Level Lifting Mechanism M5
Slewing Mechanism M4
Trolley Traveling Mechanism M4
Mast section dimension 1830*1830*2800/1830*1830*2500
Main chord ∠125*∠125*12 Thick Manganese Steel
Slewing  Way Double-gyration
Rated torque (kn.m) 800
Working range(m) Maximum Working Range 60
Minimum Working Range 3
Lifting height(m) Free-stand(m) With wall-tie-ins(m)
45 150
Standar Mast Section Number 15/17
Max lifting load (t) 8
Lifting Mechanism Motor type YZTD200L -4/8/24
Multiplying factor a = 2 a = 4
Lifting capacity/velocityt/(m/min) 1.5/80 3/40 3/8.5 3/40 6/20 6/4.2
Power(kw) 24/24/5.4
Trolley Traveling Mechanism Motor type YDEJ100 L -4/6
Velocity(m/min) 48/24
Power (kw) 3.3/2.2
Slewing Mechanism Motor type YZR132M2-6
Velocity (m/min) 0.62
Power (kw) 3.7*.2
Climbing Mechanism Velocity (m/min) 0.5
Power (kw) 7.5
Working pressure (mpa) 20
Total power(kw) 36.7(exclude climbing mechanism)
Counterweight Max working range (m) 60 42 11.27
Weight (t) 1 2 8
Working temperature(ºC) -20~+40

Operation Cabin installation

1. Operator cabin install in an exposed outdoor marine environment .It can withstand any anticipated explosion pressure and impact form objects possilbly contained in a blast. 2. The operator cabin is heavy steel construction,fully welded,suitable for outdoor marine application. 3. It include 4 lifting lugs for transporting. 4. Construction and insulation are Non-combustible. 5. Door is fitted with door closer ,panic door lock and windows. 6. Windows are fitted with double safety glass, sealed, double glazed and tined, Front window complete with wiper systems and washers, Bottom windows have hinged protection guarding. 7. Complete with Operator chair, HVAC, Light, switch.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours