Description
Ship loader structure is mainly composed of steel structure, jib belt conveyor, feeder tripper, luffing mechanism, slew mechanism, travel mechanism, spray system, chute, electric system, necessary safety components and accessory devices. Ship loader jib could slew, luffing, prolong and shorten itself. And chute could also prolong and shorten itself in up and down direction.Technical Parameter Table
Rated capacity | t/h | 300 | 1000 | 1800 |
Max.capacity | t/h | 360 | 1200 | 2000 |
Bulk cargo | Coke | Bulk cement | Coal | |
Ship size | DWT | 5000 | 5000 | 5000 |
Width of belt conveyor | mm | 1000 | 1400 | 1400 |
Speed of belt conveyor | m/s | 2.5 | 2.42 | 3.5 |
Chute extending length | m | 8.15 | 19.5 | 19.5 |
Chute extending length speed | m/min | 9.3 | 4 | 3.6 |
Product Features
1.The capacity of ship loader ranges from 600t/h to 4500t/h, and the capacity of double-function ship loaders ranges from 200t/h to 3000t/h. 2.The ship loaders is equipped with fully enclosed vacuum cleaning system according to environmental protection requirements. 3.The ship loaders use wear-resistant chute made of imported materials, with long durability. 4. The ship loader-unloader is connected to the main structure of unloader through articulation, and walks together. 5.The ship loader can load various material such as coal, ore, cement etc.Painting
The ship loader shall use the zinc epoxy painting system. They paint could guarantee a minimum paint life of minimum 5 years against cracks, rusty, peeling and discolourtion. Every surface of metal have surface cleaning according to standard sis st3 or sa2.5. Then they are painted with one coat of epoxy zinc rich primer with dry film thickness of 15 microns. The primer coat - shall be painted with one coat epoxy zinc rich primer, dry film thickness of 70 microns. The intermediate paint shall be painted with one coat epoxy micaceous iron oxide, dry film thickness of 100 microns.The finish coat shall be painted with two coats, poly urethane, the thickness of each coat is 50 microns.The total dry film thickness shall be not less than 285 microns.Crane Management System (CMS)
The crane management system shall be full computerised operation, complete with sensors and transducers which shall be installed permanently on each crane and work in conjunction with the plc. provide with the monitor to monitoring diagnostics of crane, telling the data collection on the crane’s operating system, operated jointly with the device at least including the electrical power supply device, motor controls, operator control, motor, gear reducers and etc., such programme shall be flexible enough to change or modify by the operator at later stage. Having following function. 1.Condition Monitoring 2.Fault Diagnosis 3.Store the record and display system Preventive maintenanceOutline Drawing